Features to start

Duration
Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Participants
Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Location
Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Course Designed for
Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Course Objectives
When the participants complete these lessons, they will be able to:
- Provide Thermal Local Operators with the Theoretical and Practical knowledge required to enable them to assume the responsibility of Combined Cycle Control Room Operator with used DCS Simulator.
Prerequisites
- Employee must be has a Higher College certificate
- Employee must have a basic knowledge of the English language
- Employee must have attended the Course (Gas and Steam Turbines Technology and Operations Recovery Boiler and Turbine Operations)
Course Outline
- Gas Turbine Systems and operations
- Hear Recovery Boiler Systems and Operations
- Combined Cycle Simulator Power Plant Start-up and Shutdown and Emergency shutdown with used DCS simulator
- Combined Cycle Troubleshooting
Frequently asked questions
[elementor-template id="3622"]
[elementor-template id="3658"]
Similar Programs
Registration
[elementor-template id="3755"]